Utility-scale wind farm proposed for the Mamaku Range.
Scale & Location
Mangapapa Wind Farm is a proposed utility-scale generation project. The current design parameters include up to 70 turbines, subject to ongoing environmental, technical, and engineering assessments.
The project is situated in the Mamaku Range, in the Bay of Plenty region. This location was identified due to its consistent wind resource, compatible topography, and proximity to the national electricity grid.
Project Rationale
New Zealand requires significant investment in new renewable generation to ensure long-term electricity security and support broader decarbonisation efforts. Mangapapa Wind Farm is intended to provide reliable, utility-scale electricity to the national grid, contributing to national resilience and economic stability.
Development Process
The Mangapapa Wind Farm project development is a multi-year process involving rigorous scientific and technical evaluation. Our current focus includes:
ONGOING
____
Wind Resource Assessment
Long-term measurement of wind speeds and patterns to optimise turbine placement and output.
ONGOING
____
Environmental Studies
Baseline surveys of local ecology, avifauna, and hydrology to inform design and mitigation strategies.
ONGOING
____
Engineering and Design
Geotechnical investigations and civil engineering design to ensure structural integrity and minimise land disturbance.
ONGOING
____
Grid Connection
Technical studies in coordination with Transpower to ensure stable integration with the national transmission network.