Mangapapa Wind Farm

Powered by Wind,
Built for the Future.

Our Commitment to Powering New Zealand’s Renewable Future.

Mangapapa Wind Farm is a proposed utility-scale renewable energy project designed to support New Zealand’s long-term electricity security, decarbonisation, and economic resilience - delivering nationally significant renewable infrastructure with respect for the whenua, environment, and wider community.

We recognise that projects of this scale are about more than energy generation. They are about people, place, and legacy. As guests on the whenua, we are committed to working alongside the community with openness, transparency, and respect throughout every stage of the planning and assessment process.

PROJECT INSIGHTS

Seventy
Turbines proposed

Utility-scale generation capacity

Mamaku Range

Bay of Plenty

Identified for consistent wind resource

National Grid

Direct connection

Supporting long-term electricity security

Fast-track

Consenting pathway

Referred for national significance

Keeping our Community Informed Throughout Every Stage.

As planning and technical assessments continue for the Mangapapa Wind Farm, we remain committed to sharing transparent, factual information about the project’s progress, potential impacts, and long-term benefits for the region and New Zealand.

The project has now been referred for consenting under the Fast-track process, with environmental baseline studies and technical investigations currently underway across the proposed site.

Project Activity

ONGOING
____

Technical Assessments

Wind resource monitoring, geotechnical investigations, and grid connection studies are progressing to refine project parameters.

ONGOING
____

Mana Whenua Engagement

Regular dialogue and collaboration with mana whenua continues, ensuring the project aligns with local values and respects the whenua.

ONGOING
____

Environmental Baseline Studies

Comprehensive ecological, avifauna, and hydrological assessments are underway across the proposed site to inform design and mitigate potential impacts.

MAY 2026
____

Fast-track Referral Submitted

The Mangapapa Wind Farm project was officially submitted to the Minister for Infrastructure for consideration under the Fast-track Consenting Act.